Over the past few weeks, the piling has taken place for the foundations of the new shop. As there will be flats above the shop, this has taken some time due to the depth required.

Pinling about to start. The portakabins and portaloo are already in situ in front of the old shop (still open, but this was taken early morning before we opened)
Concrete was then added to ground level and the bricks delivered ready for the walls to go up – over the next few weeks the look of the site will change quite a bit as the main shape of the building emerges. Our new shop will be in the typical red brick of the area, designed to match many of the existing buildings in Twyford.